Brisbane, Queensland · Commercial & strata property servicesCall 0493 371 961
HandySeal · Case study

Sunroom, Subsill & External Drainage Assessment

An enclosed sunroom and adjoining external concrete slab presented several possible building-envelope water entry pathways, requiring a staged assessment and practical remedial proposal.

Brisbane, QueenslandVisual building-envelope assessmentVisual assessment completed

The challenge

Water ingress concerns affected an enclosed glazing assembly beside brickwork and an external slab. Potential contributing factors included unsealed interfaces, surface falls and poorly functioning drainage channels.

Inspection approach

External and internal visual inspections examined the window subsill-to-brickwork junction, accessible sealant and waterproofing details, slab levels and drainage provisions. These visual findings informed a recommended scope; controlled water testing was proposed separately and should not be confused with completed testing.

Key observations

Glazing interfaces

A gap of approximately 40 mm was observed along sections of a roughly 12 m window-to-brickwork interface; a larger unsealed junction around 70 mm was also noted.

Drainage and slab falls

The adjoining slab was approximately 21 m², with areas falling towards the building. Drainage channels contained accumulated debris.

  • Potential for water accumulation and travel beneath accessible window subsill interfaces.
  • Peeling or deteriorated accessible internal subsill sealant.
  • Obstructed channel drainage and inadequate external falls as possible contributing factors.
  • External wall-to-floor junctions requiring more reliable sealing.

Staged proposed remedy

  1. Sunroom glazing and subsill: temporary glazing removal and reinstallation where necessary, preparation of accessible junctions, primer and waterproofing membrane application, and internal subsill resealing.
  2. External slab and drainage: install two drainage pipes, make local channel and slab repairs, clean and prepare approximately 21 m² of surface, and apply the proposed membrane system.
  3. Main entrance: reseal the accessible wall-to-floor junction.
Assessment completed

The visual assessment documented potential water ingress pathways around subsill junctions, external slab falls and drainage. A three-part remedial scope was prepared for client consideration.

Have a building leak that needs investigating?

Talk to HandySeal about a practical inspection and photographic findings.

Email an inspection enquiry Call 0493 371 961